DESIGN IMPOSED LOADS:

All building members included in this offer are designed for the following Load:

Live Load on Roof = 0.65 KN/m 2
Live Load on Frame = 0.65 KN/m 2
Dead Load on Roof = Self weight of Building
Wind Speed = As per BNBC for Different areas

DESIGN CODES

The following codes are applied to design this building -

Loads are counted in accordance with:
» Bangladesh National Building Code, 1993
» The 1986 edition (1990 Supplement) of the Low Rise Building System Manual Metal Building Manufacturers Association (MBMA)

1230 Keith Building, Cleveland, Ohio 44115-2851

Hot rolled sections and built up sections are designed in accordance with:

Manual of Steel Construction ( 1989)
Allowable Stress Design (9 th Edition)
American Institute of Steel Construction (AISC)
1 East Wacker Drive, Suite 3100 , Chicago , IIIinois 60601-2001, USA

Welding is applied in accordance with:
1996 American Welding Society (AWS D.1.1.96)
Structural Welding Code - Steel Manual
550 NW LeiJeune Road , Miami , FL33135, USA

Connections are designed in accordance with:  

  • Manual of Steel Construction

Volume II Connections (ASD 9 th Edition/LRFD 1 stEdition)
American Institute of steel Construction (AISC)
1, East Wacker Drive, Suite 3100, Chicago, IIIinois 60601-2001, USA


STEEL WORK FINISHING


 a) Primary Steel:

All primary steel including Base Plate, Bearing Plate etc. will be cleaned and painted at our factory after fabrication with one shop coat red oxide primer only.

MATERIAL SPECIFICATION (STANDARD)

Sl. No.

Components

Specifications

  • 1

Primary Members : Built-up Section

M.S. Plate - ASTM A570 – 50. Minimum yield strength =345 Mpa

  • 2

Secondary Members: Purlin & Girt (M. S.)

Rolled Formed steel. Minimum yield stress 250 mpa.

  • 3

Roof Sheeting in/c Ridge Capping etc.

(Pre-Painted)

Hi-Tensile 0.47 mm thick Steel Profile Sheets with min. yield strength of 550 N/mm2 coated with an alloy of 55% aluminium, 45% Zinc, coating mass shall be 150 gm/m2.

  • 4

Wall Cladding in/c Gutter,Capping, Flashing etc. (Pre-Painted)

Hi-Tensile 0.47 mm thick Steel Profile Sheets with min. yield strength of 550 N/mm2 coated with an alloy of 55% aluminium, 45% Zinc, coating mass shall be 150 gm/m2.

  • 5

Fastener

Imported heavy duty Hex head self taping screws with new prime seal washer

  • 6

 

X-Bracing

Cable

Conform ASTM A475. F y = 119.70 kN/cm 2

  • 7

 

Galvanized Anchor Bolts

JIS G3101 – SS 400. F y = 24.50 kN/cm 2

  • 8

High Strength Bolts

A325 M Type 1 Hot Dip Galvanized

  • 9  

Glass Wool Insulation

( Kimmco, Kuwait)

  • Glass Wool Blanket with single sided aluminium foils facing.
  • Available thickness 50mm
  • Density – 12 ~ 16 Kg/M³
  • Roll Size – 20M × 1.20M

9-a) Work Safety :

  • The Customer to ensure congenial working environment free from any encumbrance, disturbance, extortion and or toll collection at the Project Site. For any adverse consequence, any loss, damage to the property, material and or physical harassment inflicted to the workers/personnel’s all liabilities thereto will be on Customer.
9-b) Tools & Equipments :

       ■ Erection materials, tools and equipments should be allowed to be taken out for any           modification or engineering work outside the site without interruption at the           Contractor’s convenience.

9-c) General Care :
  • 1) Handling and Storage : To preserve the sheeting material surface, handling should only be carried out using clean, dry gloves. Do not slide sheets over rough surfaces or on each other. Packs of Hi-Ten Steel Cladding sheets in all finishes must be kept dry in transit and stored on clean ground under cover to prevent water and / or condensation being trapped between adjacent surfaces. If packs become wet, sheets should be separated, wipe with a clean cloth without delay and place so that air circulation completes the drying process. These procedures are recommended to avoid possible deterioration of the coating which could lead to a reduced life expectancy or poor appearance.

  • 2) Additional Care for Decking Arrangement: In the event of concreting on Decking Materials including Decking Beam, adequate number of Props must be used under the Beam & Slab during concreting. Till the settlement and perfect curing of the concrete, placement of additional load on the said floor to be avoided. After propping arrangement the floor must be placed before MSBS authorized representative for checking, and after their acceptance only the concreting can be started.



 
 
 